The Process
Space for Sub-Title Here

1. Free Site Plan

Layout of the Building on Your Property

2. Design & Options

Building Length
(customizable to any 10-foot increment)

Steel Color

Siding & Finishes, etc

3. Plans

Structural Design
(requires soil report)

Optional Architectural Package
• requires equipment plans
• if preferred, you can use a local architect
 • permit-ready construction plans

4. Fabrication & Delivery

14-17 weeks from the time of final fabrication order

Materials shipped to your site in coordination with your construction timeline

3. Plans

Structural Design
(requires soil report)

Optional Architectural Package
• requires equipment plans
• if preferred, you can use a local architect
 • permit-ready construction plans

4. Fabrication & Delivery

14-17 weeks from the time of final fabrication order

Materials shipped to your site in coordination with your construction timeline